📄️ Project Background
Project Monolith (ML) is a prospective greenfields, open pit gold project located in Westalia. Based on a pit optimisation exercise in early 2026, Project ML has 3 initial mining areas that form 3 pits. The northern and eastern-most pits are considered satellite pits with the southern-most pit targeting the main mineralisation at depth, in excess of 500m.
📄️ Collate Data
Prior to starting the Orepath Mining Simulator, ensure that all foundational information is collated and easily accessible from the working directory of your Orepath Mining Simulator project.
📄️ Import Assets
Creating new Project
📄️ Project Setup
Retrieve Setup Parameters
📄️ Design Network
Click on the Add Item button in the Networks pane on the left to create a new Haulage Network and name it accordingly.
📄️ Simulate Scenario
In the Scenarios pane, click on the Add Item icon to add a new Scenario and give it a name.